Who it's for · Delivery team

Keep work moving.
Before it stops.

Project Directors, Construction Managers, Planners and Foremen. Background gives delivery teams the programme intelligence they need to identify constraints, protect float and keep work moving — before problems become visible in a report.

The delivery team challenge

The signals are there. Getting them to the right people in time is the problem.

Activity momentum slows before float disappears. Crew shortfalls emerge before output drops. Workface constraints form before they become blockers. Background finds these signals in the data that already exists on site — and delivers them to the people best placed to act, before the window closes.

Why is Package 14 slipping?
Where is the crew shortfall showing up?
How much float do we actually have?
Which work packages are at risk this week?
What is causing the cycle time to extend?
Are we going to make the milestone?
Questions Background answers — before you have to ask them.

What delivery teams receive

Intelligence framed for delivery.

Immediate
Workface constraint identified
Crew present but unable to progress. Access blocked, material unavailable or plant constraint identified. Delivered the moment Background detects the pattern — not at the end of shift.
Immediate
Momentum loss — float at risk
Activity rhythm deteriorating against programme. Cycle time extending. Float compressing toward a critical threshold. Construction Manager and Planner notified simultaneously.
Daily
Programme intelligence
What changed today. Which work packages moved. Where float was consumed. What requires attention tomorrow. Delivered at the end of each shift — not compiled from memory in a Monday morning meeting.
Daily
Crew and resource picture
Actual crew versus planned. Plant utilisation versus requirement. Resource gaps identified and connected to the work packages they affect.
Weekly
Programme trend
Which work packages improved. Which deteriorated. Where patterns are emerging that are not yet visible in the programme. Background sees the trend before the report does.
On demand
CompoundLM™ — ask anything
What was the cycle time on WP-014 last Tuesday? Which work packages consumed float this week? What interventions are open against Package 6? Grounded in project evidence.

For delivery teams

Background is successful when the delivery team spends less time finding problems and more time removing them.

Constraints identified early. Work continuing to flow. Resources used effectively. Float protected until it needs to be spent. That is what delivery intelligence looks like in practice.

Next step

See delivery intelligence in action.

Walk through a real delivery scenario — programme drift identified, constraint surfaced, intervention created and tracked. From first observation to closed loop outcome.

Connects to your programme
Background loads your P6 or equivalent programme and tracks activity against it in real time. Float is calculated from what is actually happening — not what was planned.
Routed to the right person
A workface constraint goes to the Foreman. A programme risk goes to the Planner and Construction Manager. A float threshold goes to the Project Director. Each person receives what is relevant to them.
Linked to evidence
Every piece of delivery intelligence traces back to the observation that created it. When a constraint is disputed, the evidence is already there.